Dicky Mint
Senior Member
Hi I haven't posted for some time but I have a little problem which I remember I first had when first I started to work with the PICAXE.
What are the very minimum serout commands that an OLED (2x8) should receive before sending a variable?
I suspect the first time around that it was Eclectic who shared the basic information with me, and perhaps he will again.
I'm planning to build a portable metronome with digital display.
I am in the process of getting together all the components, software and case together
I will design the PCB in Sprint Layout as I've used it for years and I find it does practically everything I ask of it!
Thanks in advance
Rick
What are the very minimum serout commands that an OLED (2x8) should receive before sending a variable?
I suspect the first time around that it was Eclectic who shared the basic information with me, and perhaps he will again.
I'm planning to build a portable metronome with digital display.
I am in the process of getting together all the components, software and case together
I will design the PCB in Sprint Layout as I've used it for years and I find it does practically everything I ask of it!
Thanks in advance
Rick